What is Chapter 8 Traffic Management?

Posted on in Barrier Gates, Concrete Barriers
Chapter 8 Plastic Barrier

When it comes to UK road safety and traffic management, the enforcement of Chapter 8 regulations offers no better safety etiquette guide. 

Whether you’re involved in the construction industry overseeing traffic flow for obstructed building access, maintenance or logistics work, or any other work requiring temporary traffic management and control, understanding Chapter 8 safety rules (particularly the purpose of road safety barriers) is vital for safety and compliance.

At Maltaward, we’ve worked with numerous companies and public sector organisations to implement bespoke, effective Chapter 8 solutions, and we understand the importance of correct traffic management for protecting workers, drivers, and pedestrians.

With that in mind, let’s break down the essentials of Chapter 8 regulations into an easy-to-understand format.

What is Chapter 8?

Chapter 8 refers to a specific section of the Traffic Signs Manual issued by the Department for Transport. This comprehensive code of practice establishes the standards for temporary traffic management during roadworks, maintenance activities, and other duties. Chapter 8 covers everything from vehicle markings and signage to the strategic placement of road safety barriers and temporary traffic control measures.

How to Comply With Chapter 8 Rules

Vehicle Markings

Any vehicle operating on high-speed roads (above 40mph) must display visible, approved chevron markings. 

The recognisable red and yellow reflective stripes are designed to ensure complete visibility, especially during harsh weather conditions or when the sun goes down and long-term vision is obscured.

Temporary Traffic Barriers and Equipment

Chapter 8 compliance also encompasses a wide range of temporary traffic management equipment, including (but not limited to):

  • Concrete barriers (more on this later)
  • Interlocking traffic blocks 
  • Traffic cones and delineators
  • Temporary and clear signage 

What Role Do Road Safety Barriers Play in Chapter 8?

Road safety barriers represent one of the most important elements of Chapter 8 traffic management. These temporary barriers separate designated work zones from often heavy or fast-moving traffic, providing ample physical protection for workers and clearly marking safe pedestrian and vehicle routes.

Types of Chapter 8-Approved Barriers

Concrete Barriers 

Jersey concrete barriers, for example, offer excellent impact resistance and stability. Their substantial weight makes them ideal for high-risk environments (e.g. work on motorways or dual carriageways), as they can withstand considerable impact and force without warping or breaking.

Interlocking Concrete Blocks 

For projects requiring adaptable configurations, interlocking concrete blocks are incredibly versatile. These modular blocks can be quickly reconfigured as project requirements change, and are easily adjustable with the right lifting equipment.

TVCB Systems 

Temporary Vertical Concrete Barriers (TVCBs) combine the stability of concrete with integrated metal fencing options. This dual product offers improved pedestrian safety with substantial vehicle protection in an adjustable system.

EVO Barriers 

Contemporary EVO barriers represent the latest evolution in temporary traffic management. These lightweight yet robust barriers offer rapid deployment capabilities whilst maintaining the protective qualities essential for Chapter 8 compliance.

When Chapter 8 Compliance Is Required

Chapter 8 regulations apply to any work activity on the UK highway network, including:

  • Construction and maintenance projects
  • Utility installations and repairs
  • Emergency response operations
  • Event management where road closures are necessary
  • Any situation where workers or equipment operate near live traffic

Whilst Chapter 8 isn’t legally mandated in England, it’s an appropriate benchmark for industry best practices, and is regularly cited by local authorities and principal contractors. 

Planning Your Chapter 8 Traffic Management Strategy

Effective traffic management begins with thorough planning. Consider these essential steps:

  • Evaluate the hazards and risk profile of your site
  • Determine the expected speed of vehicles in the area
  • Confirm how manoeuvrable your system needs to be
  • Establish the expected time frame for your project

Consider the speed of system deployment, traffic and vehicle levels, surrounding environmental factors and how flexible you need them to be as you are progressing through your project.

Partner With Maltaward for Complete Peace of Mind

Successful Chapter 8 compliance requires expertise in both regulatory requirements and practical application. The right partner should offer comprehensive solutions encompassing planning, supply, installation, and ongoing support.

At Maltaward, we bring over 30 years of experience in traffic management and safety solutions. Our comprehensive range includes concrete barriers, interlocking concrete blocks, TVCB systems, and all the ancillary equipment necessary for complete Chapter 8 compliance. Whether you’re planning emergency roadworks or managing a long-term construction project, we provide tailored products and services that prioritise safety whilst minimising disruption to road users.

Contact our specialist team today for expert guidance on implementing effective road safety barriers and traffic management solutions tailored to your specific needs.

Contact Us

Want a free quote or have questions? Fill out our form below and we’ll respond ASAP.

Add Any Supporting Documents Or Images
Max. file size: 32 MB.

Why Choose Maltaward Barriers?

 

  • Fast and Friendly Service
  • 30 Years Experience with Proven Track Record
  • FORS Gold Certified
  • ISO 9001 Certified
  • Local Authority and Major Property Managers Approved
  • Heathrow & Gatwick Airport Approved
  • Range of Solutions to Suit Your Budget

What Our Clients Think Of Us

We are really greatful for you guys organising these barriers, the driver was early, took no time at all and we are now properly secure. We will only use you for this sort of stuff in future, 10/10 service.

Jak

I just express our thanks for the short hire of the blockers and the gate and the services provided by Del yesterday.

We have had excellent feedback, not only internally but from our Customer who was holding the event and it would not have gone so smoothly if Del did not play his part so efficiently and professionally.

Everything ran so smoothly.  His Majesty would not have known the amount of work that went into making the event possible not only by the SEGRO team but all of our service partners.

It is not often that feedback is positive but it is important for you to know how grateful we are to you and the team and ask that you thank Del from SEGRO, Felix and personally from myself.

Joanna, Property Manager at SEGRO

Superb job done by you guys and Hal! She was very happy!

Chiswick Sports Ground, London